Installation of flushing and development of low-flow wells

Name of the scientific organizationName of the research projectName of the developed technology, product, or service that you plan to commercializeScientific novelty of researchDegree of research noveltyBranchFull name, position, academic degree, qualification and work experience of the project supervisorContactsProject TeamWhat commercial and consumer problems will be solved as a result of the project’s commercialization?
JSC VolkovgeologyDevelopment of technical means and equipment of the ground-based complex for the development of low-yield wellsComplete set of the UPOS well flushing and development unit, technology of works carried out with the help of UPOSComprehensive use of all developments for flushing and development of low-yield wellsUuluchenie of consumer characteristics in comparison with domestic analoguesUranium mining companyA. A. Mushrapilov, Chief Engineer of the branch of JSC “Volkovgeologiya” of TSOME, qualification-mining engineer, work experience of 18 years.7 775 233 2307, mushrapilov_aa@vg.kazatomprom.kz1. Zhasymbekov B. E., Head of PNTBiP TSOME, Master of Engineering and Technology in spec. 6M070600 – “Geology and exploration of MPI”, experience of 10 years 2. Eshenkulov R. N., Chief technologist of PNTBiP, Bachelor in “Oil and Gas Business”, experience of 21 years 3. Abilkhanov O. A., Engineer-designer 1 cat. PNTBiP, Master of Engineering and Technology in spec. “Automation and management”, 3 years of experienceReduction of various non-productive costs