Project number | 048-16-GK |
name of the project | “Organization of ammonium perrenate production from rare-metal technogenic raw materials” |
Applicant | RSE in PCW “National Center on Complex Processing of Mineral Raw Materials of the Republic of Kazakhstan” |
Grantee | RGP on PCV “National Center on Complex Processing of Mineral Raw Materials of the Republic of Kazakhstan” |
Private Partner | |
Implementation period | 2016-2019 |
Place of sale (city/region) | Almaty |
Industry | Metallurgy and metal working |
Implementation status | for investment |
Objective of the project | Creation of ammonium perrenate production with capacity of 300 kg/year from rare-metal raw materials. |
Project Description | Project idea: organization of ammonium perrenate production with the capacity of 300 kg/year of the finished product on the basis of pilot area for processing of rare-metal raw materials. The production includes pyro- and hydrometallurgical site. The pyrometallurgical site can conduct roasting, smelting and sintering with subsequent production of rhenium concentrates. The hydrometallurgical section is designed to produce a productive solution of rhenium suitable for extraction using existing technologies. In case of absence of necessity of thermal processing, raw material is exposed only to hydrometallurgical processing. I.e. the site can operate under a combined scheme of processing rare-metal raw materials, as well as under separate hydrometallurgical processing schemes. The first loading of production is carried out on the basis of lead slime, available at RGP “NC KPMC RK”. This type of raw materials can provide production of rhenium for 10-15 years. |
Website | cmrp.kz |
List of products sold with prices | ammonium perrenate |
Project team (full name) | F.A. Berdikulova.
Zharmenov A.A. Terlikbayeva A.Z. Sydykov A.O. E.A. Mazulevskiy S.A. Dzhusupov. T.S. Dagirov |